Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Baie-Comeau South (S) aluminium smelter
Søderberg capacity was closed in August 2013. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data ...
Belgaum aluminium smelter
Belgaum was closed in 2009. The cells were transferred to Hirakud. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a num...
Qinghai Yellow River aluminium smelter
With the addition of the Line 4, total smelter capacity would rise to 1.2Mt/a. Wood Mackenzie’s asset reports are built from the bottom up, incorpo...
Xinwang aluminium smelter
We start costing the Xinwang operation from 1998, when the operation became solely prebake. The closure of the converted Søderberg line in 2008 red...
Alumínio aluminium smelter
Line 13 (Sala 8) was scheduled for commissioning in 2009-2010, but has been pushed back. By Q1 2011, about 1/3 of the total capex had been disperse...
Porto Vesme aluminium smelter
Porto Vesme ceased production in 2012. In 2013, Alcoa indicated that the curtailment may lead to the permanent closure of the smelter. Wood Mackenz...
Viewing page 460 of 472