Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Polaris (Closed) zinc mine
Capital costs were $89M plus $32M working capital. Standard work schedule 11 hour shifts, six days per week, thirty-five weeks per year. Pine Point...
Uralsk (P) aluminium smelter
The prebake lines were commissioned in 1994 to eventually replace the Søderberg lines, which came online in 1939. The Søderberg lines closed in 200...
Uralsk (S) aluminium smelter
The Søderberg lines were closed in 2009. Uralsk is now an exclusively prebake technology operation. Wood Mackenzie’s asset reports are built from t...
Uralsk alumina refinery
The Uralsk refinery was commissioned in 1939 together with a smelter of the same name. The refinery had far greater capacity than required by the i...
Urucum (J&F Mineracao) iron ore mine
Urucum is a now-closed mine owned by Vale located approximately 27 kilometres from the city of Corumba in the state of Mato Grosso do Sul, Brazil. ...
Tongsheng zinc smelter
The Tongsheng zinc smelter in Turpan in Xinjiang, China uses pressure leaching technology and was commissioned in 2013. With Phase I of project com...
Viewing page 443 of 471