Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Tintaya copper minesite
Before closing in 2012, Tintaya was operating a 20kt/d ore concentrator supported by an open pit. It also operated a 34kt/a cathode SxEw plant unti...
Titimukhta (Closed) gold mine
Titimukhta is an open pit mine that was commissioned in 2009. Both gravity and resin-in-leach processing are used and the plant has a capacity of 2...
Tolukuma (Closed) gold mine
The Tolukuma gold mine is a small underground operation, mining epithermal gold silver rich veins which average 0.2 - 2.0m wide. Average mill feed ...
Tongchuan Xinguang aluminium smelter
We cost the operation from the start up of the prebake line in 2005. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a n...
Tongling (Jinchang) (closed) copper smelter
Jinchang smelter whose former name was Tongling No.2 smelter is a subsidiary of Tongling Tongdu Tongye Stock Co., Ltd. and was constructed by Anhui...
Tallering Peak iron ore mine
Mining at Tallering Peak ceased in 2014 when the reserve was exhausted. Tallering Peak was a conventional open cut iron ore mine located 172 kilome...
Viewing page 378 of 471