Asset Report

St Fergus (SAGE)

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The St Fergus (SAGE) Terminal accepts gas from the Scottish Area Gas Evacuation System (SAGE), the Britannia System and, before it ceased, the Atlantic & Cromarty system. The gas is processed at the terminal before onward transportation to the National Transmission System (NTS). The plant can supply up to 20% of UK gas demand in any one day. The SAGE pipeline transports gas from the Beryl riser in the Northern North Sea (including cross border volumes from Norway) and the East Brae ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Declining throughput
      • Quad 209 potential
  • Location maps
  • Participation
    • Terminal
    • Pipelines
      • SAGE overview
      • SAGE user fields
      • Future Potential
      • Britannia user fields
      • Atlantic and Cromarty
    • Pipeline
      • Scottish Area Gas Evacuation System (SAGE)
      • Britannia System
  • Costs

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • St Fergus (SAGE) System map
  • Participation: Table 1
  • Throughput: Table 1
  • Throughput: Table 2
  • Gas throughput profile

What's included

This report contains:

  • Document

    St Fergus (SAGE)

    PDF 1.85 MB

  • Document

    St Fergus (SAGE)

    XLS 244.50 KB