St Fergus (NSMP)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Declining throughput a challenge for pipeline and terminal owners
- Location maps
- Participation
-
Development
- Terminals
-
Pipelines
- Frigg System
- Shetland Island Regional Gas Export (SIRGE)
- Miller Gas Line
- Throughput
-
Costs
- Capital Costs
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- St Fergus (NSMP) System Map
- Participation: Table 1
- Throughput: Table 1
- Throughput: Table 2
- Development: Table 1
- Development: Table 2
What's included
This report contains:
Other reports you may be interested in
Shetland Gas Plant
SummaryThe TotalEnergies-operated Shetland Gas Plant (SGP) was constructed between 2011 and 2015 to process gas volumes from the ...
$2,580St Fergus (Shell)
The Shell-operated terminal facilities at St Fergus processes gas from the Far-north Liquids and Associated Gas System (FLAGS), the ...
$2,580St Fergus (SAGE)
The St Fergus (SAGE) Terminal accepts gas from the Scottish Area Gas Evacuation System (SAGE), the Britannia System and, before it ...
$2,580