Q3 2019 pre-FID upstream project tracker: deepwater leads the way
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Q1 2025 pre-FID project tracker: Slow start to 2025 ended by go-ahead for ADNOC and Shell mega projects
Our Q1 2025 outlook for global pre-FID upstream projects.
$6,750PETRONAS FLNG 2 - commercial overview
The SB H block in deepwater Sabah contains four gas fields that will be developed as part of the first phase of a Floating LNG (FLNG) ...
$2,700Gato do Mato and Sul de Gato do Mato
Gato do Mato is a deepwater pre-salt oil and gas discovery located on the concession block S-M-518 and the PSC block Sul de Gato do Mato.
$3,720