NOGAT System
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary
- Key Issues
- Location maps
- Participation
-
Development
-
Pipeline
- Phase 1
- Phase 2
- Further Development
- Terminal
-
Pipeline
- Throughput
-
Third party users
- Tariff income
-
Costs
- Capital costs
- Operating costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Exchange rate
- Global Economic Model (GEM) file
-
Economic analysis
-
Cash flow
- US$ million
- million
-
Cash flow
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- NOGAT System map
- Participation: Table 1
- Throughput: Table 1
- Throughput: Table 2
- NOGAT System throughput profile
- Economic analysis: Table 1
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
- 4 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Tyra - NOGAT Pipeline
In 2003, the Danish Underground Consortium (DUC) companies and DONG Energy (now Orsted) agreed to build a pipeline linking the Tyra ...
$2,580Tyra East-Nybro Terminal Gas Pipeline
The Tyra East-Nybro Terminal Gas Pipeline is the main gas trunkline which links all the gas producing fields on the Danish shelf (with ...
$2,580Forties System
The Forties Pipeline System (FPS) is an integrated oil and gas liquid transportation and processing system with a nominal capacity of ...
$2,580