Golfinho & Canapu
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- BW Energy buys Golfinho and Camarupim from Petrobras divestment
- Disappointing production performance
- History
- Local content
-
Key Development Metrics
- Golfinho
- Pilot test
- Module 1
- Module 2
- BW Energy’s upside plan
- Canapu
- Capital costs
- Operating costs
- Oil
- Gas
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Field Hydrocarbon Characteristics
- Reserves (2P) at 01/01/2025
- Contingent Resources (2C) at 01/01/2025
- Production (2017-2024)
- Production Profile
- Capital Costs 2014 to 2023 (US$ million)
- Operating Costs 2018 to 2027 (US$ million)
- Annual Gas Prices - Golfinho
- Annual Gas Prices - Canapu
- Cash Flow (US$)
- PV Table (US$)
- 10 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Parque dos Doces
Parque dos Doces comprises the joint development of three fields located in the Espírito Santo basin, immediately to the east of ...
$3,720Punta Gorda nickel operation
A detailed analysis of the Punta Gorda nickel operation.
$2,250Codemin nickel operation
A detailed analysis of the Codemin nickel operation.
$2,250