The Brazilian Day of Forgiveness
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Executive Summary
-
Introduction
- The race for gold and the fight for a place in the grid
- Physical guarantee (GF) vs demand projections
- New license and interconnection requests after the end of subsidies for renewable projects was announced
- Regulatory flow that renewable projects must follow in order to obtain the permit to use the electricity grid
- (a) Existing contracted capacity of the transmission system (CUST) by State. (b) Market share (%) of existing CUST
- The Yom Kippur of renewable developers
- (a) Day of Forgiveness: Total capacity (MW) by state. (b) Construction status (%) of the Day of Forgiveness projects
- Day of Forgiveness: Total capacity (MW) in the interconnection queue by state
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
- (a)
- (a)
- (a)
- (a) (b)
- (a) (b)
- (a)
- (b)
- (a)
What's included
This report contains:
Other reports you may be interested in
Dias D'Avila copper refinery
A detailed analysis of the Dias D'Avila copper refinery.
$2,250Dias D'Avila copper smelter
A detailed analysis of the Dias D'Avila copper smelter.
$2,250Brazilian samba - two steps forward, one step back: Latin America month in brief
Details around JVs, licensing rounds and fiscal terms offer investors line of sight in Latin America
$1,350