Asset Report

West Musgrave copper project

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Cassini Resources Limited acquired the West Musgrave Project from BHP Billiton in 2014. Cassini paid BHP an initial deposit of A$250,000 for the project along with a 2% smelter royalty. An additional A$10 million would be paid to BHP after the mine has operated for one full year. Cassini released the results of a scoping study in early 2015. This considered two cases, the first a staged ramp-up from 1.5Mtpa to 4Mtpa in the eighth year of operation, and the second a 4Mtpa case. The first case is considered in the accompanying analysis. Full ownership of the project transferred to joint venture partner, OZ Minerals Ltd in October 2020.

Table of contents

  • Mining
  • Processing

Tables and charts

No table or charts specified

What's included

This report contains: