Operations resumed in 2014 having been suspended in 2012. Reserves are sufficient to support a mine life of up to at least 2031. The Sukhaybarat plant also treats loaded carbon from the Bulghah mine, located 65km away from the site. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.