Asset Report

Shuikoushan copper smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The smelter is located in Hengyang, Hunan province. The smelting technology is Bottom-blown Furnace, and the capacity is 555 kt/a of concentrate treated, and the anode capacity is 119 kt/a. The overall sulphur collection efficiency is over 98% Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry-standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download, which enables the interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Emissions

Tables and charts

This report includes the following images and tables:

  • Shuikoushan Emission Intensity Quartile ranking - total global production - tonnes Cu
  • Feed preparation
  • Smelting process
  • Auxiliary plants

What's included

This report contains:

  • Document

    Shuikoushan copper smelter

    PDF 1.27 MB