Nimba (Yekepa) Phase 2 iron ore mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
Tables and charts
This report includes the following images and tables:
- Nimba Phase 2 Emission Intensity Quartile ranking – total global production- tonnes of ore
- Detail Map
- Participation
- Marketable reserves (at 01/01/2025)
- Production
- Production
- Operations
- Infrastructure
- Cash costs
- Cash costs
- Capital costs
- Product quality
- 1 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Nimba (Yekepa) iron ore mine
With Solway's license transferred to Arcelor Mittal, it now holds a more significant foothold over railway usage.
$2,250Simandou (Blocks 1 and 2) iron ore mine
Simandou is progressing well and is on track to meet the hard-pushed deadlines.
$2,250Kami iron ore mine
An iron ore project owned by Champion Iron. Its pre-feasibility study released in March 2024 focuses on DR-grade iron ore.
$2,250