The project will be exploited as a conventional open pit operation utilising trucks and excavators and mining will be carried out by a contractor. The processing plant will have a capacity of 6Mt/a and comprise a carbon-in-pulp (CIP) circuit. Mine life is estimated at 14 years. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.