Konimansuri is principally a silver deposit. The reserve is estimated at one billion tonnes of ore grading 49g/t Ag, 0.38% Zn and 0.49% Pb. The Tajikistan government has repeatedly put up the development of the mine on tender since 2011 but as of mid 2023 nothing has been finalised as yet. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.