Asset Report

Jinguang Qinghai EAF - Closed nickel operation

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Located in Qinghai Province near Xining City. Commissioned in November 2007 at a capital cost of RMB1bn. Utilises a single 125MVA EAF and 4 PMVA "convertors". The smelter produces NPI with a grade of around 10% Ni. This is a Fe-Ni-Cr operations which commenced construction in March 2007 and was commissioned in November. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Detailed map

Tables and charts

This report includes the following images and tables:

What's included

This report contains:

  • Document

    Jinguang Qinghai EAF nickel operation

    XLS 540.50 KB

  • Document

    Jinguang Qinghai EAF - Closed nickel operation

    PDF 1.26 MB