Asset Report

Hasbrouck & Three Hills gold mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The property comprises the Hasbrouck and Three Hills deposits. Both deposits will be mined using conventional truck and shovel open pit mining methods. Ore from the mines will be treated via heap leaching. A staged project development approach is being considered where the Three Hills deposit will be developed as Phase 1, followed by development of the Hasbrouck deposit as Phase 2. Three Hills ore will be placed onto pads as run-of-mine ore at a rate of 15ktons/d while ore from Hasbrouck will be crushed prior to placement on leach pads at a rate of 17.5ktons/d. Average annual gold production estimated at 69koz/a in years 1 & 2 (Three Hills deposit) and 71koz/a between years 3 and 8 (Hasbrouck deposit). In addition, average annual silver production of 194koz/a is expected between years 3 and 8 from the Hasbrouck deposit.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX
  • Royalties & Taxes

Tables and charts

This report includes the following images and tables:

  • Detailed map

What's included

This report contains:

  • Document

    Hasbrouck & Three Hills gold mine project

    XLS 118.00 KB

  • Document

    Hasbrouck & Three Hills gold mine project

    PDF 1.26 MB