Glencore to acquire Li-Cycle
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- The facts
- The history
- Our view
Tables and charts
This report includes the following images and tables:
What's included
This report contains:
Other reports you may be interested in
Sundsvall Plant 1 (P) aluminium smelter
A detailed analysis of the Sundsvall Plant 1 (P) aluminium smelter.
$2,250Barro Alto nickel operation
A detailed analysis of the Barro Alto nickel operation.
$2,250Xinjiang Jiarun aluminium smelter
A detailed analysis of the Xinjiang Jiarun aluminium smelter.
$2,250