The Chanderiya ISF smelter was commissioned in late 1991 to treat zinc and lead concentrates from the Rampura-Agucha Mine. Capacity at commissioning was 70kt/a zinc and 35kt/a lead. The complex also includes a lead refinery, a precious metals refinery, bismuth and mercury plants, and a plant to produce copper cathode from copper dross arising from lead refining. The capital cost of the total installation was US$125M. Following a number of commissioning problems, production became more...

Table of contents

  • Location / Transport
  • Conc. Receipt / Storage
  • Sinter Plant
  • Acid Plant
  • Smelting Furnace
  • Refining
  • Casting Plant
  • Slag Disposal
  • Other

Tables and charts

This report includes the following images and tables:

What's included

This report contains:

  • Document

    Chanderiya (ISF) zinc smelter

    PDF 1.14 MB