The CentroGold project is planned as an open pit operation utilising conventional drill, blast, load and haul open pit mining methods. Mine life is estimated at 10 years with an average life of mine gold production of 120koz/a. The mill is expected to comprise crushing, grinding, gravity concentration, flotation and carbon in leach circuit with a capacity of 2.5Mt/a.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes the following images and tables:

  • Detailed map

What's included

This report contains:

  • Document

    CentroGold gold mine project

    XLS 114.50 KB