A challenging future for secondary zinc
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Executive summary
- Introduction
- Conclusion
Tables and charts
This report includes the following images and tables:
- Zinc flows
- Identified annual waelz, mine and smelter production capability (kt Zn)
- De-carbonisation will help to drive the growth in EAF steel output
What's included
This report contains:
Other reports you may be interested in
West Taijinar (Citic Guoan) - Lithium brine
A detailed analysis of the West Taijinaier 2 lithium brine operation.
$2,250Mikkaichi (Electrothermic) zinc smelter
A detailed analysis of the Mikkaichi (Electrothermic) zinc smelter.
$2,250Jiyuan (Yuguang) zinc smelter
A detailed analysis of the Jiyuan (Yuguang) zinc smelter.
$2,250