Asset Report

MLNG - Sabah Sarawak Gas Pipeline

Get this report*

$2,700

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

SummaryThe Sabah Sarawak Gas Pipeline (SSGP) connected gas fields in Sabah to the MLNG export complex in Bintulu. The northern segment of the pipeline was permanently closed in August 2023 after significant disruptions. Meaning gas can no longer flow from Sabah to MLNG. The pipeline had a 36-inch diameter and was 512 km long. Before the pipeline was closed down capacity was allocated to the Kebabangan Cluster and SB1 Kinabalu fields. The Kebabangan Cluster held rights to around 500 mmcfd of ...

Table of contents

  • Summary

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    MLNG - Sabah Sarawak Gas Pipeline

    PDF 896.05 KB