GATE - LNG regas terminal
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Initial capacity – 12 bcm (8.7 mmtpa)
- First expansion – 4 bcm (2.9 mmtpa)
- Second and third expansion s - 4 bcm (2.9 mmtpa)
- Available capacity
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Klaipeda - LNG regas terminal
The Klaipeda LNG terminal is the only operational LNG terminal in the Baltics, providing an alternative to Russian gas
$1,450Adriatic - LNG regas terminal
Adriatic LNG is an operational offshore LNG import terminal located in the Isla di Porto Levante also known as Rovigo LNG
$1,450Dahej - LNG regas terminal
The Dahej terminal is owned and operated by Petronet LNG Limited, a corporation set up by the government to import LNG and develop ...
$1,450