Coral Norte FLNG - Commercial Overview
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
-
Commercial structure
- Financing
-
Timeline
- Exploration
- Participation
- LNG output
- LNG contracts
- Shipping
- Economic analysis
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Commercial structure: Image 1
- Timeline: Table 1
- LNG output: Image 1
- Summary economics
- Breakeven economics (US$/mmBtu)
- Coral Norte FLNG Map
What's included
This report contains:
Other reports you may be interested in
Coral FLNG - Commercial Overview
The Coral field, Eni's fourth gas discovery in Mozambique. The field will be developed as a floating liquefaction natural gas (FLNG). ...
$2,700Algeria LNG - Commercial Overview (Bethioua)
Algeria LNG's GL1Z and GL2Z plants are located at Bethioua in the Arzew area. Bethioua's first plant, GL1Z, came ...
$2,700Algeria LNG - Commercial Overview (Arzew GL3-Z)
In 2008, Algeria LNG awarded an EPC contract for a new 4.7 mmtpa train at Arzew, called GL3Z.
$2,700